THE NONO SKILLING & EMPOWERMENT CENTRE

Kirinya, Bweyogerere, Wakiso, Uganda. A permanent base and the physical home of the Nono Caring Hearts Foundation transformation model.

plannedProject status

Total building cost

UGX 393,862,496

Source: Kirinya project BOQ

Construction figures are taken directly from the Kirinya project BOQ. Equipment figures are indicative organisational strategy estimates, not BOQ figures.

Architectural renders

Proposed Nono Skilling & Empowerment Centre — Kirinya

The supplied renders are the official visual reference for the proposed building. Click any image for the full-screen view.

Proposed Nono Skilling & Empowerment Centre — KirinyaClick to view full screen
  • Proposed Nono Skilling & Empowerment Centre — Kirinya — interior

  • Proposed Nono Skilling & Empowerment Centre — Kirinya — grounds

  • Proposed Nono Skilling & Empowerment Centre — Kirinya — front elevation, courtyard view

  • Proposed Nono Skilling & Empowerment Centre — Kirinya — full site with perimeter and parking

  • Proposed Nono Skilling & Empowerment Centre — Kirinya — approach and parking

  • Proposed Nono Skilling & Empowerment Centre — Kirinya — rear elevation

Build Kirinya

BUILD KIRINYA

Nono Caring Hearts Foundation is working toward establishing and strengthening a dedicated training and enterprise centre in Kirinya, Uganda.

The centre is the infrastructure the next stage of this work depends on: larger training intakes, safe and consistent production, and enterprise activity that helps the work carry a growing share of its own cost. Partners can help build it — in cash, in kind, or in expertise.

Where the project stands

Today, next, and still open.

An honest picture of the build in three columns. We describe status in words, not in invented percentages.

Photo placeholder — current training and production space

In place and in use

WHAT EXISTS TODAY

Active training and production activity, a working team, established products, and the relationships that keep the work running in the space currently available.

  • Training already running with active apprentices
  • Nono Star household product production
  • A team of trainers and production staff
  • Customer and community relationships in Kirinya and Bweyogerere

In place and in use

Architectural visualisation of the proposed Nono Skilling & Empowerment Centre at Kirinya

Underway or being developed with partners

WHAT WE ARE BUILDING

A dedicated centre designed around training and production together, so learning, making and selling happen under one roof.

  • Dedicated training spaces for each trade
  • Purpose-built production facilities
  • Enterprise and storage infrastructure
  • Shared community and administration space

Underway or being developed with partners

Soap making factory equipment and outfit — tanks, cutters, stamping machine, drying racks and PPE

Not yet funded

WHAT WE STILL NEED

The parts of the build that are confirmed as needs but not yet funded. We list them as needs, not as pledges we have already received.

  • Equipment for the trade workshops
  • Training materials and consumables
  • Furniture and fit-out
  • Utilities, technology and connectivity

Not yet funded

Areas of support

Nine confirmed needs. Pick the one you can carry.

Each of these is a need our team has confirmed. Some are already being developed with partners; others are open.

Training spaces

01

Rooms and workshops sized for real cohorts, laid out for the trade being taught rather than borrowed for it.

Underway or being developed with partners

Production facilities

02

Space where products can be made safely and consistently, at a volume that supports both training and sales.

Underway or being developed with partners

Equipment

03

Machines and tools per trade — sewing and overlock machines, mixers and ovens, salon and production equipment.

Not yet funded

Training materials

04

The consumables practical training uses up daily: fabric, oils and chemicals, ingredients, packaging, protective gear.

Not yet funded

Enterprise infrastructure

05

Storage, packaging, stock handling and the systems that let production run as a real business, not a demonstration.

Not yet funded

Technology

06

Computers, connectivity, point-of-sale and record-keeping — the digital backbone for training, orders and reporting.

Not yet funded

Furniture

07

Benches, worktables, chairs, shelving and storage. Unglamorous, and the difference between a room and a workshop.

Not yet funded

Utilities

08

Power, water, sanitation and safety provision sized for training and production running at the same time.

Not yet funded

Other confirmed infrastructure needs

09

Additional site and building requirements confirmed with our technical team as the build progresses.

Not yet funded

On figures

The detailed capital requirement is being developed with partners.

We publish figures only where they come from a source we can show you — the project BOQ for construction, and clearly labelled indicative ranges for equipment.

We do not publish a percentage-complete or amount-raised figure we cannot evidence. Partners in conversation with us receive the current position in writing.

Build with us

A building is not the point. What happens inside it is.

Kirinya gives this work the space to train more people properly, produce to a standard that sells, and turn skills into income. Partners can fund a room, a workshop, a set of machines — or walk the whole project with us.

Start where it makes sense for you.

No payment is taken on this website. We share full documentation and the current position in writing before any commitment is asked for.

Project overview

What is being built

A purpose-built centre bringing training, production and enterprise incubation onto one site, so skilling capacity and earned income can grow together.

The centre is presented as the physical home of the Nono Caring Hearts Foundation transformation model — care, skills, production, income, dignity and community transformation happening in one place.

Why it is needed

Today the work depends on very small premises, which caps how many women and young people can be trained at once and makes production hard to run safely and consistently. A permanent base removes that ceiling.

A permanent base for

  • Skills training
  • Enterprise development
  • Production
  • Community programmes
  • Practical learning
  • Women and youth empowerment

Kirinya, Bweyogerere, Wakiso, Uganda

Building scope

Two floors, built around production and training together

Ground floor — multipurpose hall

planned

Large flexible hall for production runs, practical demonstrations, community programmes and large-group training.

First floor — classrooms

planned

Dedicated teaching rooms for theory, enterprise and business-skills sessions running alongside production below.

Service and support areas

planned

Water, sanitation, safe working provisions, storage and dispatch supporting daily production and training.

Production and skilling workshops

planned

Specification, area and fit-out per the architectural drawings and BOQ.

Training and demonstration classrooms

planned

Specification, area and fit-out per the architectural drawings and BOQ.

Enterprise incubation and business support space

planned

Specification, area and fit-out per the architectural drawings and BOQ.

Storage, packaging and dispatch area

planned

Specification, area and fit-out per the architectural drawings and BOQ.

Water, sanitation and safe working facilities

planned

Specification, area and fit-out per the architectural drawings and BOQ.

What will happen inside

ONE BUILDING. MANY PATHWAYS TO A LIVELIHOOD.

Proposed training areas and functions the centre is designed to host.

  • 01

    Soap & detergent production

  • 02

    Baking & confectionery

  • 03

    Yoghurt & dairy processing

  • 04

    Tailoring & textiles

  • 05

    Catering & hospitality

  • 06

    Hairdressing & beauty

  • 07

    Enterprise & business skills

  • 08

    Community and outreach programmes

Proposed functions — planned, subject to equipment funding

Funding requirement

How much it costs

Construction figures come directly from the Kirinya project BOQ. Equipment figures are indicative and separate from the construction budget.

Step one

Build

UGX 393.86M

UGX 393,862,496 — from the Kirinya project BOQ

Then equip

Equip

UGX 135M–270M

indicativeIndicative equipment requirement

Building cost breakdown — BOQ

Preliminaries
UGX 3,200,000
Ground Floor — Multipurpose Hall
UGX 222,234,736
First Floor — Classrooms
UGX 158,821,358
Contingency
UGX 9,606,402
Total
UGX 393,862,496
indicative

Indicative equipment requirement

UGX 135M–270M

01Soap & Detergent Production
UGX 25M–50M

Mixers/boilers, plodder and cutter, moulds and stamps, weighing scales, stainless worktables, chemical storage, PPE, packaging and sealing equipment

02Baking & Confectionery
UGX 25M–50M

Commercial oven, planetary and dough mixers, proofer, slicer, trays, racks and trolleys, worktables, utensils, scales

03Yoghurt & Dairy
UGX 20M–40M

Milk pasteuriser, fermentation and incubation equipment, stainless milk containers, filling and sealing equipment, refrigeration, testing equipment

04Tailoring & Textiles
UGX 20M–40M

Industrial sewing machines, overlock machines, cutting tables, irons, mannequins, cutting tools, embroidery and finishing equipment

05Catering / Hairdressing / Other Trade Toolkits
UGX 25M–50M

Heavy-duty cookers, refrigeration, stainless tables and sinks, salon chairs, wash basins, dryers, styling and sterilising equipment, trade starter kits

06Furniture / Water / Power / Workshop Fit-out
UGX 20M–40M

Workbenches and furniture, water storage and plumbing, solar backup and power distribution, shelving, ventilation, drainage and safety equipment

Indicative organisational strategy estimate. Not part of the BOQ construction budget and not a confirmed equipment schedule — figures are subject to supplier quotations.

indicative

Overall capital-and-equipment envelope

Approx. UGX 530M–665M

Indicative combined capital-and-equipment envelope: BOQ construction cost plus the indicative equipment range. Indicative only — the construction budget and the equipment requirement are funded and reported separately.

Download project information
planned

Preliminaries

Site set-up and preliminary works per the Kirinya project BOQ.

UGX 3,200,000
planned

Ground Floor — Multipurpose Hall

Production, demonstration and community hall per the BOQ.

UGX 222,234,736
planned

First Floor — Classrooms

Teaching rooms for theory, enterprise and business skills per the BOQ.

UGX 158,821,358
planned

Contingency

BOQ contingency provision.

UGX 9,606,402
indicative

Equipment and fit-out

Indicative equipment requirement — separate from the BOQ construction budget.

UGX 135M–270M
current
In place today
planned
Designed, not yet delivered
target
Goal being funded toward
indicative
Estimate, not yet confirmed

Project at a glance

UGX 393.86M

Construction cost — BOQ

UGX 135M–270M

Indicative equipment

UGX 530M–665M

Total capital envelope

6

Training & service areas

Phased build-out

How the centre gets built, phase by phase

Each phase can be funded on its own. Construction phases follow the BOQ; equipment is funded separately, area by area.

  1. 01

    Site preparation & preliminaries

    UGX 3,200,000

    Site clearance, setting out, hoarding, temporary works and mobilisation as costed in the BOQ preliminaries.

    planned
  2. 02

    Ground floor — multipurpose hall

    UGX 222,234,736

    Substructure and the ground-floor production and multipurpose hall: the working heart of the centre.

    planned
  3. 03

    First floor — classrooms

    UGX 158,821,358

    First-floor teaching rooms for theory, enterprise and business-skills sessions above the production floor.

    planned
  4. 04

    Contingency & completion

    UGX 9,606,402

    BOQ contingency provision, finishes and handover of the completed building.

    planned
  5. 05

    Equipment & fit-out

    UGX 135M–270M

    Production and training equipment installed area by area. Funded separately from the construction budget.

    indicative

Capital campaign tracker

UGX 0

Verified funding recorded

UGX 393,862,496

Construction target — BOQ

0% of the construction target funded

No verified construction funding has been recorded to date. This tracker is updated only against confirmed, documented commitments — never against pledges or projections.

Be the first recorded commitment to the Kirinya centre.

Future use of the building

What the centre becomes once it is open

A permanent training base

planned

Continuous intakes rather than short courses squeezed into borrowed rooms.

A working production site

planned

Soap, detergent and food production run to order, generating earned income.

An enterprise incubator

planned

Graduates get workspace, mentoring and market access as they start out.

A community hub

planned

Outreach, family support and community gatherings hosted on site.